Skip to content
Technical Proposal
← Back to blog

How to Showcase Company Experience That Convinces Etimad Committees

10 min read

The reference and team sections are where most bidders volunteer the most material — and lose the most points. A 60-page experience appendix containing 40 references is not stronger than a tight 20-page appendix containing the 5 most relevant ones. Committees do not score volume; they score relevance and evidence.

This guide walks through how to choose, organize, and present past work and team credentials so the committee can verify your fitness in minutes rather than hours.

How committees actually read the experience section

In our scoring work we observe a consistent pattern: the committee opens your reference list, looks for similarity in scope, sector, size, and duration, and stops paying attention after the first three or four entries that miss those filters. After that, even genuinely relevant references later in the list often go unread.

10–20%
of total score
typically allocated to past experience
3–5
references usually scored
even when more are submitted
100%
should be sector-relevant
unless capped by the booklet

The implication: lead with your three most comparable references. If you have only two genuinely comparable projects, that is the message — pad with adjacent ones, but be honest about the difference.

What "relevant" actually means

A reference is genuinely relevant when it scores well across all four of these dimensions:

Relevance dimensions of a reference project
Sector match (gov / regulated)100%
Scope match (similar deliverables)95%
Contract size (within ±50% of current)90%
Duration (within ±50%)80%

A reference scoring high on all four dimensions counts roughly 3× as much as one scoring on only one.

A telecom infrastructure project bid into a healthcare cybersecurity tender will score low even if the contract value matches. The committee weights sector and scope match more heavily than size.

A reference-project template that scores

Use the same template for every reference. Predictability helps the committee read fast.

FieldWhat to write
Client name and type"Ministry of X (government)" — attach completion certificate
Contract valueSAR figure; note if multi-year
Contract durationStart and end dates; flag if ongoing
Your rolePrime, subcontractor, or consortium member; % share of value if relevant
Scope of work4–6 bullets, mapped to deliverables relevant to the current tender
Outcomes deliveredMeasurable: % uptime achieved, days saved, users trained, savings %
Team continuityNames of key people on this past project who will work on the new one
Verification contactClient-side reference with name, role, and contact (with permission)

Presenting team credentials

Team credentials are evaluated on three things: relevance to the scope, currency of certifications, and continuity (people who actually exist and will actually work on the project).

A team CV template

  • One page per key role (PM, Solution Architect, Lead Engineer, QA Lead, etc.)
  • Photo, name, role on this project
  • 3–5 most relevant past projects with one-line descriptions
  • Certifications relevant to the booklet (PMP, ITIL, CCNA, ISO lead auditor, etc.)
  • Short statement of what the person specifically will do on this engagement

Certifications: relevance over volume

Listing 30 certifications dilutes the impact of the 5 that actually matter. Highlight the certifications the booklet asks for, and the 2–3 most relevant beyond that. The rest belongs in an appendix, not the main team section.

Booklet asks for…Strongest evidence to attach
PMP-certified PMCurrent PMP certificate (not expired) for the named PM
ISO 27001 audit experienceCertified Lead Auditor cert + 2 past ISO 27001 audit projects
Cloud architectureCurrent AWS/Azure/GCP solution architect cert for named arch
Saudi-licensed engineersCurrent SCE membership card for each named engineer

The most common mistakes

Avoid

  • 40 reference projects, none clearly comparable to the current scope.
  • CVs that are clearly generic — same person 'Lead' on every project type.
  • Listing certifications without dates (committee assumes expired).
  • Naming people who won't actually be on the project (bait-and-switch).
  • Past outcomes stated as adjectives ('successful', 'on time') without numbers.

Do instead

  • 3–5 references that are clearly comparable, ordered by closeness of match.
  • Tailored CVs that map each person's past work to the new booklet's scope.
  • Current certificates with effective dates; replace expired ones before submission.
  • Commit named people; if they may rotate, say so explicitly with named replacements.
  • Outcomes with numbers: '99.7% uptime over 24 months', 'SAR 2.1M annual savings'.

A short worked example

A boutique consulting firm was bidding a SAR 3.2M public-sector strategy engagement. Their first reference list had 22 entries — most were private-sector tech work. They scored 8/15 on past experience.

For the rewrite, we removed 17 of the 22 entries and kept only the 5 closest matches. Each was rewritten in the template above with measurable outcomes and named team continuity. They scored 13/15 on the rewrite.

RoundReferencesAvg. relevance scorePast-experience score
02241 / 1008 / 15
1778 / 10011 / 15
2592 / 10013 / 15

Less material, more points.

How Technical Proposal helps

We store your company file and reference projects in a private workspace, then automatically pick the most relevant past work for each new booklet — drafting professional write-ups that map each reference to the current tender's clauses. The Technical and Business evaluation agents flag references that don't carry their weight and recommend which to drop. CVs are similarly tailored per-bid so each person's narrative maps to the role the booklet describes.